Editing Carbine
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
The edit can be undone.
Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision
Your text
Line 8:
Line 8:
|mech type=IndustrialMech |mech type=IndustrialMech
|feet=2 |feet=2
− | cost = (estimated) 1,562,600 [[C-bill]]s + | cost = (estimated) 1,562,600 C-bills
| introduced = [[2691]]<ref>[http://masterunitlist.info/Unit/Details/461/carbine-con-1-constructionmech MUL Profile for CON-1 Carbine ConstructionMech - Introduction Date Only. This is for purpose when first one came on line.]</ref> | introduced = [[2691]]<ref>[http://masterunitlist.info/Unit/Details/461/carbine-con-1-constructionmech MUL Profile for CON-1 Carbine ConstructionMech - Introduction Date Only. This is for purpose when first one came on line.]</ref>
| mass = 30 | mass = 30
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 8: | Line 8: | ||
|mech type=IndustrialMech | |mech type=IndustrialMech | ||
|feet=2 | |feet=2 | ||
− | | cost = (estimated) 1,562,600 | + | | cost = (estimated) 1,562,600 C-bills |
| introduced = [[2691]]<ref>[http://masterunitlist.info/Unit/Details/461/carbine-con-1-constructionmech MUL Profile for CON-1 Carbine ConstructionMech - Introduction Date Only. This is for purpose when first one came on line.]</ref> | | introduced = [[2691]]<ref>[http://masterunitlist.info/Unit/Details/461/carbine-con-1-constructionmech MUL Profile for CON-1 Carbine ConstructionMech - Introduction Date Only. This is for purpose when first one came on line.]</ref> | ||
| mass = 30 | | mass = 30 |